Talk

Virtual

What we planned vs. what we shipped: A platform migration story

Trellis went from idea to 100% compute migration in under 18 months. What made it work: developers got autonomy & speed, ops got to address long-term tech debt. This is what that actually looked like, including what we planned vs. what we built.

CEST

Justin Abrahms walks through the full arc of Trellis, Thrive Market's internal platform, from a Confluence document of grand ideas to 100% migration off EC2 in under 18 months.

Justin covers:
• The before state: Developers waited on ops for everything, and ops was drowning in insecure legacy infrastructure.
• Why the migration actually happened: Developers gained locus of control, and ops got to delete years of technical debt.
• How the proposal changed during implementation: What the grand ideas were versus what shipped.
• What 100% migration looked like from both sides: Developer experience and operational reality.
• Where the platform was headed next.

This is a practitioner account of a real migration, not a success story. It includes what changed mid-build and why.

Virtual

Register for PlatformCon 2026